Pwd Schedule Of Rates 2018-19 Karnataka Pdf May 2026
While the main SSOR (Standard Schedule of Rates) is for the whole state, the 2018-19 PDF also included annexures for DSR to account for transportation variations.
This is the tabular data most people search for. Each item has a unique code, description, unit, and total rate (₹). Examples include:
| Item Code | Description | Unit | Rate 2018-19 (₹) | | :--- | :--- | :--- | :--- | | 101 | Earthwork excavation in ordinary soil | cum | 180.00 | | 804 | Providing and laying reinforced cement concrete (M20 grade) | cum | 5,250.00 | | 1201 | Plastering with cement mortar (1:6) – 12mm thick | sqm | 98.00 | | 2531 | Providing vitrified tiles (Flooring) | sqm | 520.00 |
Note: The above rates are illustrative. The actual PDF contains hundreds of items, including road work (bitumen, WMM), bridge works (piling), and sanitary fittings.
A: Yes. Arbitration tribunals frequently use the SoR of the contract year (2018-19) plus a prescribed escalation index (specific to Karnataka PWD) to calculate current due amounts.
If you want, I can:
Which would you like?
The Karnataka Public Works Department (PWD) Schedule of Rates (SR) 2018-19 serves as the primary technical document for estimating costs and preparing tenders for government construction projects across the state. It establishes standardized rates for labor, materials, and machinery usage to ensure consistency and transparency in public spending. Key Components and Framework
Administrative Oversight: The 2018-19 SR was drafted by a 13-member committee chaired by the Managing Director of Krishna Bhagya Jala Nigam Ltd (KBJNL).
Foundation of Rates: While technical specifications from the 2016-17 SR were largely retained, rates were updated based on current market costs for cement, steel, and fuel.
Labor and Wages: Rates include revised minimum wages and updated variable dearness allowance (VDA).
Overhead and Profit: Standard provisions include 10% for Overhead Charges (covering supervision, site offices, and quality control) and 10% for Contractor’s Profit.
Cost Calculations: Rates are generally inclusive of materials, labor, machinery hire, royalty, and transportation (lead and lift), but typically exclusive of GST, which is added separately to estimates (often at a rate of 12% for this period). Technical Highlights pwd schedule of rates 2018-19 karnataka pdf
Material Provisions: Specific focus was placed on the use of Manufactured Sand (M-Sand) to discourage river sand mining.
Quarterly Updates: The document allows for quarterly updates to the cost of volatile materials like cement and steel to account for market fluctuations.
Machinery Hire: Hire charges were recalculated based on variations in the Wholesale Price Index (WPI) for construction and mining machinery.
Interest Rates: The rate of interest on capital cost for machinery was reduced from 11% to 9% for this cycle. Document Structure
The SR is typically divided into chapters covering specific construction categories: SCHEDULE OF RATES
SCHEDULE OF RATES. Page 1. WATER RESOURCES DEPARTMENT. GOVERNMENT OF KARNATAKA. Govt Order No. WRD 146 KBN 2017, BENGALURU Dt: 21- While the main SSOR (Standard Schedule of Rates)
ಕೃಷ್ಣ ಭಾಗ್ಯ ಜಲ ನಿಗಮ ನಿಯಮಿತ
Public Works Department Schedule of Rates for Buildings 2021
The first 50 pages define the scope. Key definitions from 2018-19 include:
When analyzing the 2018-19 PDF, engineers look for the percentage increase from the previous year. Notable changes in that financial year included:
Simply looking at the final rate in the PDF is not enough for a tender bid. You need to understand the analysis. For example, if the PDF shows Item# 502: Brickwork (1:6) – ₹ 4,500 per cum, the analysis (found in the appendix of the PDF) shows the breakdown:
If you have the 2018-19 PDF, you can reverse-engineer this calculation to prove your billing to the Government Engineer. Format: Usually organized by work categories with unit